Search
Close this search box.

Maintenance works were carried out in Eceköy / Bozöyük / Bilecik 𝗚𝗘𝗦

NEWS

Maintenance works were carried out in Eceköy / Bozöyük / Bilecik 𝗚𝗘𝗦

In 𝗘𝗰𝗲𝗸𝗼̈𝘆/𝗕𝗼𝘇𝗼̈𝘆𝘂̈𝗘𝗰𝗲𝗸𝗼̈𝘆/𝗕𝗼𝘇𝗼̈𝘆𝘂̈𝗸/𝗕𝗶𝗹𝗲𝗰𝗶𝗸 𝗚𝗘𝗦, 2 panels were assembled by assembling XLPE transport stand and cable pulling.

The 1st panel’s secondary current, voltage and control cables were pulled, wiring connection and relay settings were made.

İletişime Geç
1
💬 Yardıma mı ihtiyacınız var?
Scan the code
Merhaba
Size Nasıl Yardımcı Olabilirim